The Green Corridor bridge will close on Monday, July 25, 2022, from 09.00 am to 7.00 pm.
After 7.00 pm, the bridge will partially open.
Traffic will be redirected via the the Spaanslagoen bridge (Telearuba and Sabana Basora/ Franse Pas. The duration of the work is two weeks.
The Department of Public Works (DOW) and the Police Force (KPA) urge the general public of Aruba and all motorists and inhabitants to be aware of the upcoming redirection.
Share this page